The timeline of a wind energy farm has 4 main phases: The development phase where the right site is located, the wind farm is designed and the permits are obtained (up to 10 years), the Implementation phase (1-2 years), the Operation and Maintenance phase (20-25 years) and the Decommissioning/Repower phase (1year).